Project img1
SUPPORTMENT OF A REINFORCED CONCRETE PLATE IN A SWIMMING CENTER Supportment of basement ceiling plate using steel structure frames
CUSTOMERS PEGASUS AQUA CENTER
AREA VERIA, IMATHIA

The ground floor ceiling plate was supported with steel structure frames at the basement level
for the purpose of installing a precast swimming pool (50.00 m2).
The steel structure was calculated in order to carry safely the additional loads of the new pool.